Guide to the documents for initial activation of a gas supply

When an application is submitted for the activation of a gas supply to a new system, you are given documentation that includes:

What is initial activation of a gas supply?

Initial activation of a gas supply is when a meter is installed that has never delivered gas in a property previously connected to the distribution network. If you have not yet started the procedure for initial activation of your gas supply, see how to do so.

Technical Annexes


  • Make a copy of the annexes and keep it; it may be required later
  • Send the documentation to the energy distributor, the address is given in Technical Annex H/40, in the section on the Vendor.
 

Annex H/40 to request the supply of gas (2 pages)

This must be filled out by the holder of the gas supply contract

Annex I/40 certifying proper installation of the system (3 pages)

Contact the fitter who installed the system (or who made changes or extensions, or carried out extraordinary maintenance, etc.) for them to fill out the attachment.
 
Check that the installer has completed all the parts of the annex to avoid rejection of the application.

Installer self-certification (1 page)

This must be filled out by the fitter who installed the system, or made changes or additions, or carried out extraordinary maintenance, or other work.
 
Verifica che l’installatore abbia compilato l’allegato per evitare che la richiesta venga respinta.

Commercial annexes


  • Fill out the commercial attachments with the help of our guides given below
  • Make a copy of the annexes and keep it; it may be required later
  • Send the documentation to:

    Enel Energia
    Servizio Clienti
    Casella Postale 1000
    85100 Potenza
 

Verification of post-meter safety


Resolution 40/2014/R/GAS as amended includes new provisions on verification of the safety of gas utility systems and implements the requirement for inspection of modified or changed supply systems in order to ensure the safety of the gas facilities used by the end customer.
 
In accordance with the resolution, we provide you with a copy of the information annexes for work estimate requests received by the vendor (Annex F40).
  • These describe the formal procedure and costs for obtaining a gas supply after the installation of a new connection or a modification of the system requested by you.
 
 

Facsimile annex F/40 (3 pages)

In addition, you can find the recently updated Guidelines no. 12 via the link http://www.cig.it/pubblicazioni/ of the Italian Gas Committee (CIG).
  • These provide information on the documentation required for activation/reactivation of a gas supply