The fixed monthly fee includes all cost components as outlined below:
1) Energy Cost includes:
the energy component price equal to €0.099/kWh (including network losses) for all subscription plans within the predetermined threshold;
the CCV electricity fee, which varies depending on the chosen subscription plan:
XS €194/POD/year, S €216/POD/year, M €228/POD/year, L €240/POD/year, XL €290/POD/year;
the dispatching fee as defined by art. 24.2 of Annex A of Resolution 539/2024 - Integrated Text on Electricity Dispatching (TIDE) and as updated by TERNA and ARERA. For fee calculation purposes, a value of €0.00988/kWh (for Q1), including network losses, was used;
the fee covering the net procurement cost of capacity as defined by art. 23 bis of the TIS and valued according to art. 34.8 of the Integrated Text of provisions for the provision of last resort electricity sales services (TIV), annexed to ARERA Resolution no. 362/2023/R/eel. For fee calculation purposes, a value of €0.00440/kWh (for March 2025), including network losses, was used;
the imbalance component equal to 2% of the index (PUN index GME defined monthly, corresponding to the monthly arithmetic averages of the PUN index GME values, expressed in Euro/kWh, as determined by the Energy Markets Operator (GME) and published on the GME website, increased by the network losses as defined by ARERA). The highest arithmetic average of the unit amounts during the twelve actual months from February 2024 to January 2025 was reached in January 2025, with a unit value (excluding network losses) of €0.14303/kWh. For fee calculation purposes, a value of €0.003199/kWh (for February), including network losses, was used;
the low voltage dispatching component (DISP BT) equal to €1.32/POD/year (as defined by ARERA and listed in Annex A of the TIV).
Network losses, applied to the above fees, are defined by ARERA and currently equal to 10% of consumption.
2) Transport and Metering Service Cost and System Charges
(according to ARERA Resolution no. 568/2019/R/eel and subsequent amendments – Integrated Text of provisions for the provision of electricity transmission and distribution services (TIT), and ARERA Resolution no. 481/2017/R/eel and subsequent amendments).
These consist of the fees incurred by Enel Energia for the transport, distribution, and metering services, and of system charges as defined and updated by ARERA, including the Asos component (used to fund the incentive system for electricity production from renewable sources and cogeneration, and charged to all electricity customers).
For fee calculation purposes, the following values were considered:
a) Transport and metering service cost: €0.01352/kWh; €22.80/POD/year; €25.2788/kW/year (Q1 values);
b) System charges: €0.032188/kWh (Q1 value).
All prices and fees listed in points 1) and 2) are excluding VAT and taxes.
3) VAT and Taxes, also available on enel.it.
The following items are not included in the fixed monthly fee (but will be clearly indicated in the invoice): optional charges, automatic compensations, Cmor (default fee), RAI fee, late payment interest, any Social Bonus the Customer is entitled to, and other bonuses and/or extra discounts.
In case of activation mid-month, the monthly fee of the selected subscription plan will still apply for the first month of supply.
For more details, refer to the expense breakdown percentages in the bill.