The offer includes a price composed of:
an energy component price, excluding VAT and taxes, equal to the National Single Price (PUN Index GME) differentiated by the time slots indicated below. It is defined on a monthly basis and corresponds to the monthly arithmetic average of the actual PUN Index GME values, expressed in Euro/kWh, as determined by the Energy Market Operator (GME) and published on the GME website. This price will be increased to account for network losses applied as defined, published, and updated by ARERA;
a consumption contribution (α), excluding VAT and taxes and inclusive of network losses, fixed for the first 12 months, which will be added to the energy component price (equal to the PUN Index GME) as described above, and which represents the costs of raw material supply not covered by the PUN Index GME. Network losses are applied as defined, published, and updated by ARERA;
a marketing and sales fee (also referred to as CCV Luce) of €156/POD/year, excluding VAT and taxes, to be paid on a monthly basis. This fee is fixed for 12 months starting from the supply activation date (as per Article 2 of the General Terms of Supply, hereinafter CGF).
The energy component price is differentiated by the following time slots:
F1: 8:00 AM – 7:00 PM, Monday to Friday, excluding national holidays
F2: 7:00 AM – 8:00 AM and 7:00 PM – 11:00 PM, Monday to Friday; Saturday from 7:00 AM to 11:00 PM, excluding national holidays
F3: 11:00 PM – 7:00 AM, Monday to Saturday; all day Sunday and on national holidays
For customers with non-single-rate withdrawal points, in order to apply the fees above, the determination of the energy supplied for each time slot depends on the measurement processing method for dispatching purposes according to ARERA Resolution 278/07. In particular:
i) in case of hourly measurement processing, withdrawals per time slot will be calculated by summing the hourly measurements communicated by the distributor for each slot (ARERA);
ii) in case of slot-based measurement processing, the measurements for each ARERA slot communicated by the distributor will be used.
For single-rate withdrawal points: the energy component price will be calculated monthly and corresponds to the monthly arithmetic average of the single-rate PUN Index GME.
The energy component price (PUN Index GME + α), excluding VAT and taxes, represents approximately 43% of the total electricity cost (excluding VAT and taxes) for a non-domestic customer with annual consumption of 10,000 kWh and a contracted power of 10 kW.
The remaining cost components (dispatching price (PD), dispatching component (DISP BT), transport and metering service costs, system charges) are applied as defined, published, and periodically updated by ARERA, and as indicated in the Technical and Economic Conditions of the offer (CTE) and the General Terms of Supply (CGF).
At the end of the applicable period, Enel Energia may revise the CCV Luce and the consumption contribution (α) in accordance with Article 3.2 of the CGF.
For more details, please refer to the breakdown of cost percentages on your bill.