Valid for 2 years
Power

Enel Flex Control Impresa Luce

The indexed electricity offer with no surprises that sets a cap on the energy component price.

Payment: Direct Debit / Payment Advice

Included serrvices: Bolletta Web

Energy component: PUN Index GME + ɑ

Contract power 15-25 kW

Consumption contribution (ɑ)*

0,030 €/kWh

Electricity Supply and Sales Fee (CCV Luce)**

13 €/POD/Mese

Energy component composed of: PUN Index GME (wholesale price of the energy component) + consumption contribution (α). If the value of the PUN Index GME exceeds the maximum threshold of €0.138/kWh, the invoiced PUN Index GME price will be equal to this threshold value. Excluding VAT and taxes.

Consumption contribution (α) includes network losses, excluding VAT and taxes, to be added to the wholesale price of the energy component (PUN Index GME). The PUN Index GME, excluding VAT and taxes, will be increased by network losses. Network losses are applied as defined and published by ARERA.

The price refers to the electricity supply and sales fee (CCV Luce) equal to €156/POD/year (excluding VAT and taxes), to be paid on a monthly basis.

The fees related to the consumption contribution, the CCV, and the PUN cap are valid for 24 months from the supply activation date.

Other cost components are specified in the Technical and Economic Conditions (TEC).

For details on all cost items, please refer to the technical and economic conditions of the offer.

PUN limit

Enel Flex Control Impresa Luce

The indexed electricity offer with no surprises that sets a cap on the energy component price.

Who is the Enel Flex Control Impresa Luce offer aimed at?

If you are looking for a flexible offer for your business
If you are switching from another supplier, need to activate a new supply, request a reactivation, or transfer ownership with a supplier change.
If you love dynamism and know how to benefit from market fluctuations.

Advantages and features

Only the benefits of an indexed price, with no surprises.
If the market price of energy (PUN) drops, you pay less; if it rises, you’ll never pay more than the maximum cap for the energy component.
Flexible offer
With Enel Flex Control Impresa Luce, you pay the energy component at the wholesale price (PUN Index GME), applied as a monthly average and defined on a monthly basis, with the addition of a small consumption contribution (α) fixed for the first 24 months from the supply activation date. If the PUN value exceeds the maximum threshold, the invoiced PUN Index GME price will be capped at that threshold. You can check the Single National Price (PUN Index GME) on the website of the Energy Market Operator.
Check the Single National Price (PUN Index GME).
Why does it pay off?
Enel Flex Control Impresa Luce is the indexed offer for your business that sets a maximum cap on the energy component price.
If the PUN Index GME value exceeds the threshold of €0.138/kWh, the invoiced PUN price will be set at that value, and you will never pay more than €0.181/kWh for the energy component.
Clear contract

With at least 3 months’ notice, we may inform you in writing of the new economic conditions that will be applied to you. If you do not wish to accept the new economic conditions, you may withdraw from the contract by choosing a new supplier. The economic conditions of the offer are valid for subscriptions until 28/01/2026.


Offer code:
000142ESVML01XXBusECAn0000104635

Services

Details

What is PUN?

The PUN, or Single National Price, is the reference price of electricity recorded on the Italian electricity exchange. As of January 1, 2025, the PUN has been replaced by the PUN Index GME, which is the weighted average of electricity prices across different zones of Italy, taking into account the quantities of energy sold and the time-of-use bands.

For more information, please refer to the dedicated PUN page.

How to activate Enel Flex Control Impresa Luce

Activating Enel Flex Control Impresa Luce is very simple:

  • there is no need to intervene on your installations or your meter;
  • activation is free of charge

Enel Flex Control Impresa Luce is available to:

  • all VAT-registered users (professionals, companies, retailers and traders) using low-voltage (LV) energy supplies.

To apply for Enel Flex Control Impresa Luce please have the following handy:

  • your VAT registration number or tax ID code;
  • the POD code of your meter;
  • IBAN code, if paying by direct debit.
When is it possible to join this offer?

You can subscribe to Enel Flex Control Impresa Luce if you want to switch to Enel Energia from another electricity supplier, request a transfer of ownership with a supplier change, activate a new meter, or carry out a reactivation.
In the case of a transfer of ownership with a supplier change, you can join the offer free of charge by contacting one of our operators through the live chat dedicated to our services.

How does the Bolletta Web service work and how do I pay?

With Enel Flex Control Impresa Luce, you help protect nature by subscribing to the "Bolletta Web" service and receiving your invoice in digital format directly in your email inbox. And with direct debit from your bank account, you can also avoid waiting in line to make payments.

How do you want to pay your bill?

You can choose how you pay your bill and change payment method whenever you want.
Payments can be made via:

Direct Debit
Direct Debit is the fastest way to keep track of your payments.

You receive your bill 15 days before the due date, giving you time to make sure that the amount is correct. Payment is automatically taken on the due date.

The real advantage is that you do not pay a security deposit. What is more, your previous supplier will refund your old security deposit if you paid one.

You avoid queues at counters and do not have to remember deadlines.


pagoPA Payment Notice (see pagoPA website for the list of payment channels)

  • online with the IO app or via the website/app of your bank or other pagoPA-enabled channels;
  • locally at one of the physical channels reporting to Enel Energia (enabled Enel Space);
  • locally at banks, ATMs, post offices, supermarkets and all authorised physical points.

Web and App

From the Enel Energia portal, registering in the Customer Area, using pagoPA, your credit card, BancomatPay, PayPal, MyBank, or from the Enel Energia APP using pagoPA, your credit card, or your PayPal account.

We can confirm that when you use one of these channels you will not have to send a receipt! We will automatically register your payment.

For more details, please see the dedicated section of our site on payment methods.

What does my energy bill consist of?

The offer includes a price composed of:

  • a price for the energy component, excluding VAT and taxes, equal to the Single National Price (PUN), defined on a monthly basis, corresponding to the monthly arithmetic average actual values of the PUN, expressed in Euro/kWh, as determined by the Energy Market Operator (GME) and published on the GME website. This price will be increased by network losses, applied as defined, published, and updated by ARERA.
    If, during the twelve months following the application of the conditions in these TEC, the value of the PUN exceeds the threshold stated in the TEC, the invoiced energy component price will be capped at that value.

  • a consumption contribution (α), excluding VAT and taxes and including network losses, locked for the first 24 months, which will be added to the energy component price (equal to the PUN) as described above. It represents the cost of the raw material not covered by the PUN. Network losses are applied as defined, published, and updated by ARERA;

  • an electricity supply and sales fee (also called CCV Luce) equal to €240/POD/year, excluding VAT and taxes, to be paid monthly. This fee is fixed for 24 months from the supply activation date (as per Article 2 of the General Supply Conditions, hereinafter GSC).

The energy component price (PUN + α), excluding VAT and taxes, represents approximately 48% of the total electricity cost (excluding VAT and taxes) for a non-domestic customer with annual consumption of 10,000 kWh and a contracted power of 10 kW.

The remaining cost components (dispatching price (PD), dispatching component (DISP BT), costs for transport service and meter management, and system charges) are applied as defined, published, and periodically updated by ARERA, and as indicated in the Technical and Economic Conditions of the offer (TEC) and in the General Supply Conditions (GSC).
At the end of the applicability period, Enel Energia may revise the CCV Luce and the consumption contribution (α) in accordance with Article 3.2 of the GSC.

For more details, please refer to the cost breakdown percentages on the bill.

How is the security deposit calculated?

The security deposit, which will be reimbursed in the final balance bill, is calculated on the basis of your meter power. In particular, a unit amount equal to:

  •  €7.75/kW for installed power of 15kW or less
  •  €10.33/kW for installed power above 15kW.

For more information, see the PDF on the amounts charged as security deposit.

How does withdrawal from Enel Energia work?

You can withdraw from your contract with Enel Energia at any time and without any charge by choosing a new Supplier, who will complete the withdrawal process on your behalf and in your name, in accordance with the procedures laid down by the regulations in force. For more information, see the PDF for the "General Terms and Conditions of Supply".

What is the cooling-off period and how does it work?

You can exercise your right to change your mind, prior to contract activation without giving reasons and without any additional charges, up to fourteen days after conclusion of the contract. This period is extended to thirty days for contracts concluded through agents or agencies.

To request the application of the right to change your mind, send the relevant form, which you will find attached to the contract, to one of our contact channels. For energy and/or gas supply only, you can do this through a simple recorded telephone call to our toll-free number 800 900 860.

 

If, when signing the contract, you choose early activation of the supply, the activation time may be reduced and it will no longer be possible to exercise the right to change your mind once the relevant supply has commenced or once the new conditions of the new contract have been applied (in the case of a product change with Enel Energia).


Important: In the event of a product change, the right to change your mind can only be applied in writing.

Documents

Contract Documents

Mix of primary energy sources used for power generation

PDF 47.2 KB Download
Summary Info Sheet

PDF 212.8 KB Download
Technical and Economic Conditions

PDF 86.4 KB Download
General Documents

General Terms and Conditions

PDF 378.7 KB Download
Multi-site Form

PDF 546.5 KB Download
Application form

PDF 809.8 KB Download
Consumption Category

PDF 661.8 KB Download
Privacy policy

PDF 332.1 KB Download
Direct Debit Form

PDF 177.4 KB Download